Improvement of the Critical Production Rate Formula for Bottom-Water Reservoir with Partition Board Proposed by Dr. LI Chuan-liang
HE Wei1, HUANG Quan-hua1, REN Peng2, ZHEN Guo-shu3
1. Southwest Petroleum University, Chengdu, Sichuan 610500, China; 2. Research Institute of Drilling and Production Technologies, Tuha Oilfield Company, PetroChina, Shanshan, Xinjiang 838202, China; 3. Development Department, East Sichuan Development Company, Sichuan Petroleum Administration Bureau, PetroChina, Chongqing, 400021, China
HE Wei, HUANG Quan-hua, REN Peng, ZHEN Guo-shu. Improvement of the Critical Production Rate Formula for Bottom-Water Reservoir with Partition Board Proposed by Dr. LI Chuan-liang[J]. Xinjiang Petroleum Geology, 2007, 28(1): 125-126.
[1] Meyer H I, Garder A O. Mechanics of two immiscible fluidsin porous media[J]. Journal of Applied Physics, 1954, 25(11): 1 400-1 406. [2] Chaney P E. Howto prevent water and gas coning[J]. OGJ,1956,(5): 108. [3] Schols R S. An empirical formula for the critical oil productionrate[J]. Erdoel-Erdgas, 1972,(1): 6-11. [4] Hoyland L A. Critical rate for water coning: correlation andanalytical solution[J]. SPERE, 1989,(11): 495. [5] Guo B, Lee R L. A simple approach to optimization ofcompletion interval in oil/water coning systems[J]. SPE23994, 1992. [6] 李传亮. 带隔板底水油藏油井临界产量计算公式[J]. 大庆石油地质与开发, 1993, 12(4): 43-46.