›› 2016, Vol. 37 ›› Issue (2): 1-1.doi: 10.7657/XJPG20160214

• 论文 •    

渤中25-1南油田窄河道型油藏中途测试产能评价

何逸凡,胡勇,周海燕,汪全林,谢丽沙   

  1. (中海石油 天津分公司 渤海石油研究院,天津 300452)
  • 出版日期:2019-01-01 发布日期:1905-07-13

Evaluation of DST Deliverability in Narrow Channel Sand Reservoir in BZ251s Oilfield, Bohai Sea

HE Yifan, HU Yong, ZHOU Haiyan, WANG Quanlin, XIE Lisha   

  1. (Bohai Oilfield Research Institute, Tianjin Branch, CNOOC, Tianjin 300452, China)
  • Online:2019-01-01 Published:1905-07-13

摘要: 渤海海域的渤中25-1南油田为窄河道型油藏,油井的实际产能受河道砂体宽度影响较大,但由于中途测试时间一般较短,测试结果不能反映砂体边界对产能的影响,因此需要对测试结果进行校正。目前常用的校正方法有类比法和经验法,但它们均未考虑砂体边界对产能校正系数的影响。根据窄河道砂体油井压力响应特征,推导了考虑河道边界的稳定渗流与不稳定渗流比采油指数计算公式,进一步得到中途测试校正系数,并分析了中途测试校正系数的影响因素。结果表明,河道越窄,中途测试结果与实际生产井产能相差越大,越需要进行修正;河道宽度为100~300 m,中途测试时间为0.5~15.0 h时,中途测试的修正系数为0.3~0.7. 渤中25-1南油田的实例计算表明,用此方法校正后的产能测试结果符合油田实际情况。

Abstract: BZ25?1s oilfield is a narrow channel sand reservoir in the Bohai Sea, and the real deliverability of oil well is greatly influenced by the narrow sandbody width. Because of short testing by drill stem test (DST), the DST result cannot reflect the influence of sandbody boundary on the real deliverability, and the correction of result is necessary in general. The existing correction methods are usually based on analogy or experiences, without considering the influence of sandbody boundary on deliverablility correction coefficient. According to oil well pressure responses on the narrow channel sand bodies, this paper derives the oil production index formular of steady and/or unsteady seepage, with consideration of the channel sand boundary, further obtaining the DST result’s correction coefficient and analyzing the influencing factors of the coefficient. The results show that the narrower the channel width, the greater the difference between DST test result and actual productivity, and the more necessary the correction is; when the channel width ranges from 100 m to 300 m and the DST duration is about 0.5~15 h, the correction coefficient is about 0.3~0.7. The case study indicates that the result corrected by this method is more suitable for the actural situation in BZ25?1s oilfield

中图分类号: