Xinjiang Petroleum Geology ›› 1996, Vol. 17 ›› Issue (3): 286-290.

Previous Articles     Next Articles

COMPREHENSIVE MANAGEMENT OF SHALLOW HEAVY OIL RESERVOIR AT EARLY STAGE OF STEAM DRIVE PROCESS—An Example from District No.9 Reservoir of Karamay Oilfield

Jiang Fuxiu, Xie Dianjiang   

  1. Xinjiang Petroleum Administration Bureau Karamay 834000
  • Received:1995-08-03 Online:1996-09-01 Published:2020-07-27
  • About author:Jiang Fwciit, Senior Engineer, Petroleum Geology,Heavy Oil Development Company

Abstract: In order to control the severe situations, such as unbalanced advance of steam in plane and section, hot water breakthrough in partial intervals, 1.1% of rate of oil production, 0.12 of oil-steam-ratio, and continuous descending of development index at early stage of steam drive in Qigu formation heavy oil reservoir in District NO. 9 of Karamay oilfield, shutting in well, intennittent of steam injection, extending the tubing, added steam stimulation before steamdrive, and plugging have been successfully integrated to raise. Oil production by 48% , oil-steam-ratio by 90% , rate of oil production by 0.5%, and the number of steam drive response wells by 6 tunes, with 1: 10.1 of input-output-ratio .

Key words: Karamay oilfield, Heavy oil reservoir, Steam drive, Stimulation, Development effectiveness