Xinjiang Petroleum Geology ›› 2005, Vol. 26 ›› Issue (1): 90-92.

Previous Articles     Next Articles

The Technical Limits for Recovery of Hutubihe Reservoir in I uliang Oilfield

ZHANG Hui-yong1, WANG Yan-jie1, XIA Lan1, WANG Zhao-feng1, HE Jin-yu1, MAI Xin2   

  1. 1. Research Institute of Exploration and Development, Xinjiang Oilfield Company, PetroChina, Karamay, Xinjiang 834000, China;
    2. Department of Development, Xinjiang Oilfield Company, PetroChina, Karamay, Xinjiang 834000, China
  • Received:2004-04-29 Online:2005-02-01 Published:2020-08-24

Abstract: Taking Hutubihe reservoir in Luliang oilfield of Junggar basin as an example, this paper presents an analysis of development performance of the reservoir with low - amplitude, multi-sequence, edge-bottom water and "one sand layer as a reservoir" characteristics, an optimized parameters study of the key factors such as formation pressure, bottom hole pressure, mass production, injection pressure and recovery processes or development schemes integrated with production performance and using reservoir engineering and numerical simulation methods, and proposes the technical limits for reasonable recovery of Hutubihe reservoir. It provides reliable technical supports for long-term stable production and high-yield development of this reservoir.

Key words: Junggar basin, Luliang oilfield, reservoir engineering, numerical simulation, technique, limit

CLC Number: