Xinjiang Petroleum Geology ›› 2000, Vol. 21 ›› Issue (1): 65-68.

Previous Articles     Next Articles

Pilot Development of Kekeya Condensate Oil-Gas Field by Cyclic Gas Injection Process

Li Yuguan, Tang Chengjiu, Zhang Xinglin, Zhou Hongqing, Wang Xinyu, Du Chun, Deng Xingliang   

  1. Senior Engineer, Reservoir Engineering, Taxinan Exploration and Development Company, Xinjiang Petroleum Administration Bureau, Zepu, Xinjiang 844804
  • Received:1999-09-20 Online:2000-01-01 Published:2021-01-15

Abstract: On 2, September 1994, the cyclic gas injection began in pilot area of Xiwuy1-3 condensate reservoir, Kekeya condensate oil-gas field. As of June 1999, the cumulative gas injection amounted to 3.82x 106 m,with cumulative gas production of 3.47x106 m3,injection/ production ratio of 1.25,and cumulative condensate oil production of 68.3x104t. By using this process, the formation pressure was maintained, insitu retrograde condensation was effectively restricted, percolation flow capacity was improved, thus greatly increasing the condensate oil recovery factor. By the end of June 1999, good result of 38.6% of its condensate oil recovery percent was obtained, with incremental recovery factor of 17.6% compared with the depletion drive process.

Key words: Kekeya condensate gas reservoir, Pilot test, Cyclic gas injection, Development