新疆石油地质 ›› 2001, Vol. 22 ›› Issue (6): 520-523.

• • 上一篇    下一篇

VIP并行油藏数值模拟软件在油田开发中的应用

郑强, 牛津庐, 杨新平, 丁艺, 潘前櫻   

  1. 中国石油新疆油田分公司勘探开发研究院,新疆克拉玛依 834000
  • 收稿日期:2001-04-11 出版日期:2001-12-01 发布日期:2020-10-30
  • 作者简介:郑强(1967-),男,上海市人,工程师,油藏模拟。

Application of VIP Parallel Reservoir Numerical Simulation Software in Oilfield Development

ZHENG Qiang, NIU Jin-lu, YANG Xin-ping, DING Yi, PAN Qian-ying   

  • Received:2001-04-11 Online:2001-12-01 Published:2020-10-30
  • About author:ZHENG Qiang(1967-), Male, Engineer, Reservoir Engineering, Research Institute of Exploration and Development, Xinjiang Oilfield Company, CNPC, Karamay, Xinjiang 834000, China

摘要: 并行油藏数值模拟 是近年发展起来的新技术,既能处理大规模油藏数值模拟和超大规模油藏数值模拟,同时又能加快小规模油藏数值模拟的运算速度,使模拟更大、更快、更准确,缩短研究周期。1999 年引进的兰德马克公司VIP 5.0版并行模拟软件,包括8个CPU的黑油组分(包括裂缝)软件包及其配套软件,可运行百万级节点的大型黑油组分模型。应用新疆某油田复杂断块油气藏、海外某油田碳酸盐岩凝析油气藏、新疆某油田石炭系弱挥发性油藏对并行油藏数值模拟软件的解法稳定性、并行效率等进行了全面的测试。测试结果表明该软件解法稳定、加速效率均在75%以上。在新疆油田分公司承接的海外某油田碳酸盐岩凝析油气田调整方案和新疆油田分公司近期重点调整区块某油田西山窑组油藏加密调整方案中的应用,使模型的规模和运算速度与以往相比均有较大幅度的提高,为开发调整方案的及时制定提供了便利,赢得了时间。用VIP软件预测的推荐方案指标,在第一年实施中符合率较高。

关键词: 并行, 数值模拟, 测试, 调整方案, VIP

Abstract: The parallel numerical simulation software is a new technique developed in recent years. It is characterized by either dealing with large-scale and extra-large-scale reservoir numerical simulation,or speeding up calculation of the small-scale simulation, providing greater, quicker and more accurate modeling, shortening cycles for studying. This paper presents the VIP 5.0 introduced in 1999 from Landmark Company, which includes black oil compositional (containing fracture) software packages with eight CPU and accessory software, by which meganode big block oil compositional model can be run. The overall test has been made in solution stability, parallel efficiency, etc. by taking a complex fault-block reservoir in an oilfield of Xinjiang, a carbonate condensate field in abroad and a weak volatile reservoir of Carboniferous in Xinjiang as example. The tested results show that the software can reach stable solution, acer before through aplication in regulatory scheme of a foreign carbonate field contracted by Xinjiang Oilfield Company and in infilling adjustment scheme of Xishanyao reservoir in major regulatory block operated by Xinjiang Oilfield Company. The results provide convenience for in-time working out development regulatory schemes and gain time. It is indicated that all indexes of recommended schemes predicted by VIP sofware are in higher conformity with field conditions during its implementation for one year.

Key words: parallel, numerical simulation, test, adjustment project, VIP software

中图分类号: