新疆石油地质 ›› 2022, Vol. 43 ›› Issue (4): 479-483.doi: 10.7657/XJPG20220415

• 应用技术 • 上一篇    下一篇

水平井CO2缝间驱替产能影响因素

萧汉敏1,2(), 罗永成1,3, 赵新礼1,3, 张海琴2, 刘学伟2   

  1. 1.中国科学院 渗流流体力学研究所,河北 廊坊 065007
    2.中国石油 勘探开发研究院,北京 100083
    3.中国科学院大学 工程科学学院,北京 100049
  • 收稿日期:2021-07-21 修回日期:2022-02-26 出版日期:2022-08-01 发布日期:2022-07-26
  • 作者简介:萧汉敏(1969-),男,湖南湘潭人,高级工程师,博士,油气田开发,(Tel)010-83599495(E-mail) xiaohm69@petrochina.com.cn
  • 基金资助:
    中国石油前瞻性基础性研究项目(2021DJ2201)

Factors Influencing Productivity of Horizontal Wells With CO2 Inter-Fracture Flooding

XIAO Hanmin1,2(), LUO Yongcheng1,3, ZHAO Xinli1,3, ZHANG Haiqin2, LIU Xuewei2   

  1. 1. Institute of Porous Flow & Fluid Mechanics, Chinese Academy of Sciences, Langfang, Hebei 065007, China
    2. Research Institute of Petroleum Exploration and Development, PetroChina, Beijing 100083, China
    3. School of Engineering Sciences, University of Chinese Academy of Sciences, Beijing 100049, China
  • Received:2021-07-21 Revised:2022-02-26 Online:2022-08-01 Published:2022-07-26

摘要:

致密油藏衰竭式开发产量递减快,能量亏损严重。为探索更有效的开发方式,采用CMG-GEM软件建立水平井CO2缝间驱替模型,模拟CO2注入量、注入压力、储集层温度、裂缝间距以及裂缝长度对水平井产能的影响。结果表明:水平井CO2缝间驱替能够较大程度地增加CO2波及面积,充分挖掘剩余油,提高开发效果;注入压力为25 MPa时,CO2注入量应接近且不超过10×104 m3;日产量峰值随注入压力、裂缝间距和裂缝半长的增大而增大;储集层温度为80 ℃时,日产量峰值相对于其他温度较高,储集层温度越高,日产量达到峰值所需的时间越短。

关键词: 水平井, CO2, 缝间驱替, 致密油藏, 产能, 裂缝, 注入量, 注入压力

Abstract:

When tight oil reservoirs are developed by depletion mode, oil production declines rapidly. In order to explore a more effective development technique, a CO2 inter-fracture flooding model for horizontal well was established using the CMG-GEM software to simulate how the factors such as CO2 injection volume, injection pressure, reservoir temperature, fracture spacing and fracture length affect horizontal well productivity. The results show that CO2 inter-fracture flooding in a horizontal well can greatly increase the CO2 swept area, fully exploit the remaining oil, and improve the development effect. When the injection pressure is 25 MPa, the CO2 injection volume is close to and not more than 10×104 m3. The peak production rate rises with the increase of injection pressure, fracture spacing and fracture half-length. The peak production rate at the reservoir temperature of 80°C is higher than that at other temperatures; however, the higher the reservoir temperature, the less time will be needed to reach the peak daily production rate.

Key words: horizontal well, CO2, inter-fracture displacement, tight reservoir, productivity, fracture, injection volume, injection pressure

中图分类号: