Xinjiang Petroleum Geology ›› 2007, Vol. 28 ›› Issue (5): 615-617.

Previous Articles     Next Articles

Application of Variable Rate Transient Testing to Ultra-Deep Horizontal Well

WANG Tao1, HAN Yi-long1, WU Yi-ming1, LEI Yu1, LI Guang-yin1, LUO Zhi-feng2, LIU Lian3, LI Ling2   

  1. 1. Department of Exploitation, Tarim Oilfield Company, PetroChina, Korla, Xinjiang 841000, China;
    2. College of Petroleum Engineering, Southwest Petroleum University, Chengdu, Sichuan 610500, China;
    3. China University of Petroleum Qingdao Branch, Qingdao, Shandong 266555, China
  • Received:2006-12-25 Revised:2007-03-01 Online:2007-10-01 Published:2020-08-03

Abstract: Pressure transient testing is an important dynamic monitoring technique for obtaining reservoir information and strata parameters. The pressure build-up test and the pressure drawdown test to acquire the formation parameters are usually adopted in the oilfield. But the methods have to need certain closed-in time, which has a great influence to the production, especially to the high-yielding oil well and high-rate water injection well. Hence, a new technique of pressure transient testing is requested to overcome the disadvantage and acquire accurate information of the reservoir. The case study named variable rate transient testing in the ultra-deep horizontal well of the unsaturated sandstone reservoir of Tarim H field shows that the theory is correct, the application condition is specific, the field response is good, indicating that such a horizontal well test technique is a powerful support to the development scheme adjustment while keeping the high-yielding and the production stable in the oilfield.

Key words: unsaturated reservoir, ultra-deep well, horizontal well, pressure transient testing

CLC Number: